Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Post: #1



.The Tacoma Bridge was 1810m long suspension bridge located in
Washington State, near Puget
Sound .
.It carry the state rout 16 across the Tacoma narrows between Tacoma and Gig Harbor.
.It stretched like a steel ribbon across Puget Sound.

. It was the 3rd longest suspension bridge at that time in the world .


Even during the construction phase unusual things happened to the bridge: gentle breezes caused vertical oscillation of the roadbed. A variety of band-aids were installed to combat this prior to opening and the University of Washington committed to further study the problem.

In no time at all, the locals nicknamed the bridge, Galloping Gertie. Thousands drove hundreds of miles to experience crossing the undulating center span. For four months, the Toll Bridge Authority enjoyed a boom time as traffic was about three times what they had expected.

Concerns about the bridgeâ„¢s stability had been voiced, but the bridge officials were steadfast in their confidence in the structure.


1. Random turbulence
2. Theory of Periodic vortex shedding
3. Theory of Aerodynamic instability


An early theory was that wind pressure simply excited the natural frequencies of the bridge.This condition is known as ˜™resonance™™.


The long standing theory behind the collapse
of the bridge was proposed by the leading
aeronautical engineer Theodore von Kármán, who
was on the committee set up to study the disaster. He
was convinced that the oscillations were due to the
shedding of vortices from the bridge. As air flows
round an object, swirls of air, called vortices, are
carried away by the wind. This is due to air at
different speeds combining.


The failure of the 1940 Tacoma Narrows Bridge and the success of the current Narrows bridge is a great American saga.
When Galloping Gertie splashes in to Puget Sound ,it creates ripples effect across the nation & across the world.
Collapse of the Tacoma bridge brought the engineering world to that the aerodynamic phenomena in suspension bridges were not adequately understood in the profession nor addressed in the design .
New researches were necessary to understand and predict the aerodynamic forces .
The official investigation in to collapse recommended the use of wind tunnel tests to aid in the design of vibration, aerodynamics,wave phenomena ,etc.
Post: #2
Post: #3
please donload the attached file to know more.
Post: #4
what is the main reason for the failure?what material used for the construction?HeartHeartHeart
Post: #5
more details are there in the ppt file. you please download it.

Important Note..!

If you are not satisfied with above reply ,..Please


So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: 22146,
Popular Searches: seminar report about oresund bridge, seminar report on movable bridge pdf, de sauty bridge applications, ieee1284 bridge 2305, agma gear failure, working of automatic sensor bridge, infini bridge,

Quick Reply
Type your reply to this message here.

Image Verification
Image Verification
(case insensitive)
Please enter the text within the image on the left in to the text box below. This process is used to prevent automated posts.

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  RAINWATER HARVESTING AND ARTIFICIAL RECHARGE TO GROUND WATER full report project report tiger 11 8,609 17-12-2015 02:13 PM
Last Post: seminar report asees
  trenchless technology full report project report tiger 17 15,094 11-07-2014 10:43 PM
Last Post: ahamed fidha
  RAINWATER HARVESTING full report and ppt project topics 11 22,696 27-03-2014 01:14 AM
Last Post: onkarok9294
  skylights full report computer science technology 6 5,024 02-11-2013 01:05 PM
Last Post: sac louis vuitton pas cher
  geopolymer concrete full report project report tiger 11 20,458 16-05-2013 09:34 AM
Last Post: Guest
  green concrete full report project topics 9 34,937 12-03-2013 12:45 PM
Last Post: computer idea
  global warming full report project report tiger 15 23,032 02-03-2013 11:58 AM
Last Post: seminar details
  green buildings for quality living full report project report tiger 5 9,219 16-02-2013 10:44 AM
Last Post: nagarjun ks
  CONSTRUCTION WASTE RECYCLING full report project topics 10 12,244 08-02-2013 10:23 AM
Last Post: seminar details
  HIGH PERFORMANCE CONCRETE USING FUMED SILICA full report project report tiger 5 5,950 04-02-2013 04:55 PM
Last Post: seminar details