¢ A Nuclear power station uses nuclear energy for generating electrical energy.
¢ This power station is generally located far from populated areas.
¢ This kind of power station can be used to produce large amounts of electrical

¢ Now a days fuel used in nuclear power plant is Uranium, but it has lots and

lots of disadvantages.

What can be a remedy to all these concerns?


¢ During the early years of nuclear energy, from 1950s to mid
1970s, there was considerable interest worldwide to develop
Thorium fuels and cycles in order to supplement Uranium
¢ In mid 1960s and 80s, several experimental and prototype
power reactors were successfully operated using Thorium fuels.


¢ More abundant in nature
¢ It can be used as a nuclear fuel through breeding to uranium-233.
¢ Slightly radioactive metal.
¢ Th-232 decays very slower than uranium isotopes.
¢ Powered thorium metal will often ignite spontaneously in air & should be

handled carefully.


¢ longer fuel cycles.
¢ Increased proliferation resistance.
¢ Less waste.
¢ Slightly radioactive
¢ High burnup and improved waste form characteristics.
¢ They have many physical & chemical properties which improve reactor

¢ Available resources.


The Generation IV technologies have set demanding sustainability goals,

including more efficient use of fuel, less waste and better economic performance, as

well as improved safety and reliability, and enhanced proliferation resistance and

physical protection¦


¢ No pressure vessel required
¢ Liquid fuel requires no expensive fuel fabrication and qualification
¢ Smaller power conversion system
¢ Factory built-modular construction
¢ Smaller containment building needed
¢ Simpler operation
- No re-fueling shut down
- Significantly lower maintenance
- Significantly smaller staff
¢ Significantly lower capital costs
¢ Lower regulatory burden
¢ No grid interfacing costs:
¢ Minimum line losses


¢ Production of long lived nuclear waste.
¢ Safety issues and possibilities of nuclear accidents.
¢ Unavoidable production of fissile material (239 Pu), which can be diverted to

military applications.
¢ Some aspects of thorium cycle require specific design and operation features

for the reactor and fuel cycle facilities (reactor operation, fuel processing.


¢ A country of the size of India cannot afford to plan its economy on the basis

of large scale import of energy resources or energy technology
¢ Indigenous development of energy technologies based
on domestic fuel resources should be a priority for us.
¢ Nuclear power must contribute about a quarter of the total electric power

required 50 years from now, in order to limit energy import dependence in percentage

terms at about the current level.


Future generations will want to depend more on this type of electricity

generating powerstation due to fast increasing depletion of fuels such as coal. There

are a number of construction projects currently underway for this kind of

powerstation arround the world.

Important Note..!

If you are not satisfied with above reply ,..Please


So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: microfluidic reactor ppt, thorium reactor, boiling water reactor, design principles magnetically controlled reactor, 2350 2369 2306 2348 2312 2354 2325 2381 2359 2381 2350 2368 2358 2306 2325 2352 2327 2380 2352 2368 2354 2379 2335 2352 2368, magnetic controlled reactor, seminar projects on nucelear reactor**urrent relay,

Quick Reply
Type your reply to this message here.

Image Verification
Image Verification
(case insensitive)
Please enter the text within the image on the left in to the text box below. This process is used to prevent automated posts.

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  man made sun full report seminar presentation 2 2,557 26-12-2014 05:39 AM
Last Post: Guest
  microprocessor based system of automatic synchronizer full report computer science technology 10 7,217 05-09-2014 10:44 PM
Last Post: seminar report asees
  artificial intelligence techniques in power systems full report computer science technology 3 4,534 08-08-2014 10:39 PM
Last Post: seminar report asees
  thermoelectric power generation full report project report tiger 8 6,783 07-03-2014 07:43 PM
Last Post: Guest
  powerline communication full report computer science technology 15 15,234 02-09-2013 11:28 AM
Last Post: computer topic
  gas insulated substation full report project report tiger 14 34,771 06-08-2013 01:14 PM
Last Post: Guest
  Four-Quadrant Control of Switched Reluctance Motors full report seminar topics 3 4,055 14-05-2013 01:16 PM
Last Post: Guest
  MODELLING OF TRANSFORMER full report seminar class 2 3,079 11-04-2013 11:44 AM
Last Post: computer topic
  CONDITION MONITORING OF TRANSFORMERS full report smart paper boy 4 2,502 22-02-2013 02:23 PM
Last Post: seminar details
  protection of transmission lines using gps full report computer science technology 9 17,857 16-10-2012 01:25 PM
Last Post: seminar details